Play surfacing project finished at Signhills Academy in Cleethorpes which has involved a lot of different expertise along with working hand in hand with the client to achieve the end result.

The project involved the removal of over 1000 tonnes of soil from site to landfill which shows the extent of the works required.

The Ball Court had to be located specifically between classrooms and to meet with stringent deadlines.

We constructed a retaining wall around one end and side due to the levels then added drainage and substantial sub base works before play surface and fencing.

Surfaced with Notts Sward and has full size Netball plus 2 no. practice Netball pitches, the School will also play football and hockey plus general PE lessons meaning a real Multi Use Games Area which is clean and hard wearing!!

Bespoke design tailored to the site restrictions showing we can meet deadlines and provide a design and build service with the School.

Works carried out by our own directly employed staff who all carry up to date DBS certification.

Ongoing maintenance pack created for client to look after the surface.

Head Teacher provided a glowing reference and we pride ourselves on working closely with our clients and enjoying working with them and aim to have a professional and approachable manner

The School website is here if you wish to contact them for a reference for the works.